Fennick Cold Store

A ballasted flat-roof array that runs refrigeration through the hottest part of the day.

Fennick

2024

Aerial view of a warehouse roof covered in solar panels

System

148 kW

Panels

344

Year-one output

162 MWh

Payback

4.9 yrs

Storage

None

Want numbers like these?

Every Tiltyard quote starts with the same survey this project did. It takes about an hour and costs nothing.

The brief

A food distributor running blast chillers around the clock. Their peak demand lined up almost perfectly with peak sun, but the roof membrane could not be penetrated.

What we fitted

344 modules on weighted east-west frames, designed with the building engineer to stay well inside the roof’s load limit. Inverters sit in a shaded plant room to keep them cool.

Result

The site now covers around 38% of its annual electricity on site, and almost all of it is consumed in the building. Payback came in under five years.

Next project

Daylight, measured and fitted.

One survey, one fixed quote, one crew from scaffold to switch-on. Most roofs are generating within six weeks of the first visit.

Tiltyard

Independent rooftop solar and battery installers. Surveyed by engineers, fitted by our own crews, monitored for twenty-five years.

Visit

Unit 4, Ferrier Yard

Calder Valley

© 2026 Tiltyard Solar Co. All rights reserved.

Licensed electrical contractor · Panels warranted 25 years

Create a free website with Framer, the website builder loved by startups, designers and agencies.