Commercial
Ashby Flats Depot
A solar carport that charges a fleet of electric vans while they are parked.
Ashby Flats
2026

System
212 kW
Panels
492
Year-one output
228 MWh
Payback
5.6 yrs
Storage
120 kWh battery
Want numbers like these?
Every Tiltyard quote starts with the same survey this project did. It takes about an hour and costs nothing.
The brief
A delivery company electrifying forty vans needed charging capacity the grid connection could not supply on its own.
What we fitted
A steel carport canopy carrying 492 modules over the parking bays, paired with a 120 kWh battery and load-managed chargers.
Result
Vans now leave each morning on a full charge, and the depot avoided an expensive grid upgrade. The canopy also keeps the fleet out of the rain.
Next project